Production Counter

Count completed units.

Live Counter

Tap, click or press Space to keep count.

0

Tap anywhere inside or press Space

CPS: 0.0•Peak: 0
Step:

How the Production Counter Works

The Production Counter tallies completed units on a line or workstation and compares output with the target for the shift. The tool shows units made, units per hour and the gap to target.

  1. Set the shift target: Enter the planned output, such as 480 units in 8 hours.
  2. Tap per finished unit: Tap when each unit passes the end of the station.
  3. Watch rate and pace: The tool compares actual units per hour with the planned rate.
  4. Close the shift: Save total output, average rate and percent of target.

Production Counter Formula

The Production Counter performance equals actual output divided by planned output for the elapsed time, multiplied by 100.

Planned so far = Target ÷ Shift hours × Elapsed hours | Performance (%) = Actual ÷ Planned so far × 100
Target
Planned units for the shift
Elapsed hours
Hours worked so far
Actual
Units counted

Example: A target of 480 units over 8 hours means 60 units per hour. After 5 hours the plan is 300 units. Actual = 276. Performance = 92%.

Production Counter Reference Table

The Production Counter conversion table converts cycle time into output per hour and per shift.

Cycle time (s/unit)Units per minuteUnits per hourUnits per 8-hour shift
106.03602,880
203.01801,440
302.0120960
451.3380640
601.060480
1200.530240

About the Production Counter

A Production Counter is a manual output tally for manufacturing lines, workshops and assembly stations. The tool tracks units against a plan in real time.

Output counts feed overall equipment effectiveness (OEE), the standard factory metric that multiplies availability, performance and quality. The production counter supplies the performance part.

Ways to Use the Production Counter

There are 5 main uses of the Production Counter, including shift tracking and takt time checks.

  • Shift tracking: Supervisors watch output against the hourly plan.
  • Takt time checks: Teams compare actual cycle time with the takt time set by customer demand.
  • Small workshops: Makers track pieces made per day.
  • Piece-rate pay: Workers count finished pieces for pay records.
  • Process trials: Engineers compare output before and after a change.